Guide · Arc flash studies

Arc flash study data collection: what to capture in the field

The study is only as good as the field data behind it. This is the checklist we use: what an IEEE 1584 arc flash calculation needs, what to capture at each piece of equipment, and how to get it right in one walk.

Short answer

An arc flash study needs the utility's available fault current, every transformer's rating and impedance, every cable's size, material, sets and length, every protective device's make, model, rating and trip settings, and each enclosure's type, voltage and dimensions. Collect it per device, with nameplate and trip unit photos, and tie it to the one-line as you go.

Download the printable checklist (PDF)

Why field data decides the study

IEEE 1584-2018 calculates incident energy from a handful of inputs: system voltage, bolted fault current, electrode configuration, conductor gap, enclosure size, working distance and arcing time. Arcing time comes from how fast the upstream protective device clears the fault, which depends on its exact trip settings. One wrong trip setting or a cable length guessed short can move a label by a full PPE category.

That is why most study rework traces back to the field: an unreadable nameplate, a trip unit nobody opened, a panel that was added after the drawings were made.

The field checklist

Utility and sources

  • Available three-phase and single-line-to-ground fault current at the service, with X/R ratio (request from the utility in writing)
  • Utility protective device ahead of the service, if it affects clearing time
  • Generators: kVA/kW, voltage, subtransient reactance (X"d), X/R
  • UPS and other sources that can feed the system, and how they are switched (ATS, ties)

Transformers

  • kVA, primary and secondary voltage, percent impedance (%Z), X/R if listed
  • Winding connection and grounding (delta-wye, solidly grounded, resistance grounded)
  • Tap setting and cooling class

Cables and busway

  • Conductor size, material (copper or aluminum) and number of parallel sets per phase
  • Length, measured or reliably estimated from the route
  • Raceway type (magnetic steel conduit, nonmagnetic, cable tray) and insulation
  • Busway: manufacturer, ampere rating, length

Protective devices

DeviceCapture
Circuit breakersManufacturer, type/model, frame, sensor or rating plug, trip unit model, interrupting rating, poles
Trip unit settingsLong-time pickup and delay, short-time pickup and delay, instantaneous, ground fault (every dial or settings screen)
FusesManufacturer, class, ampere rating, part number
RelaysManufacturer, model, CT ratio, programmed settings, the breaker it trips

Equipment and enclosures

  • Equipment type (switchgear, switchboard, panelboard, MCC, disconnect) and nominal voltage
  • Bus rating and short-circuit rating
  • Enclosure dimensions and electrode configuration, used by IEEE 1584-2018
  • What it is fed from and what it feeds, so the one-line is right
  • Existing arc flash labels and their dates

Motors and other loads

  • Large motors: horsepower, voltage, starter type (they contribute fault current)
  • VFDs and soft starters on significant loads

Photos to take at every piece of gear

  • The nameplate, readable
  • The front of the equipment and the existing arc flash label
  • Each breaker's label, and each trip unit's settings
  • Inside the enclosure where it can be done safely, for bus and lug details

Doing it safely

Reading trip units and nameplates often means opening covers on energized equipment. That work is for qualified persons using the PPE and procedures your NFPA 70E program requires. Plan the walk so equipment that needs an outage or an energized work permit is grouped and scheduled, instead of discovered on the day.

Where data collection usually goes wrong

  • Settings left out. The breaker is recorded but its trip unit is not, so clearing time is guessed.
  • Typing errors. Values copied from photos into spreadsheets and then into the study software.
  • Unknown connectivity. Panels recorded without what feeds them.
  • No library match. Devices captured by name that never get matched to the exact library device the software needs.
  • Gaps found too late. Missing data discovered back at the desk means a second site visit.

How ArcRoute speeds this up

ArcRoute keeps the whole system as one connected model and turns data collection into a checklist you can see closing.

  • Start from what you have. Import an existing SKM PowerTools project, upload old one-lines, arc flash reports or panel schedules, or start from scratch on site.
  • See the gaps before you go. Every device that is missing data or is not linked to a library device is flagged, so the walk has a list.
  • Photograph instead of typing. The field app reads nameplates and trip unit settings from photos and fills in the fields. It works offline and syncs later.
  • Match the library. Breakers are matched to the corresponding SKM library device, so the model is study-ready.
  • Hand it to the study. Use the verified model in SKM or EasyPower for arc flash, short circuit and coordination studies.

See it on your own equipment

We'll walk you through ArcRoute with one of your recent jobs.

See pricing

Questions engineers ask

What data is needed for an arc flash study?

Utility available fault current and X/R, transformer ratings and impedance, cable size, material, sets and length, protective device make, model, rating and trip settings, and each piece of equipment's type, voltage and enclosure dimensions. IEEE 1584-2018 uses these to calculate arcing current, clearing time and incident energy.

Why do trip unit settings matter so much?

Arcing time is set by how fast the upstream device clears the fault, and that depends on its pickup and delay settings. A wrong or missing setting changes the incident energy and can change the PPE category on the label.

Can nameplate data be collected from photos?

Yes. With ArcRoute, field photos of nameplates, breaker labels and trip units are read automatically and the values fill the device's fields, so the engineer confirms data instead of typing it.

How often does an arc flash risk assessment need to be updated?

NFPA 70E requires the arc flash risk assessment to be reviewed at intervals not exceeding five years, and updated when major modifications or renovations change the electrical system.

Can I reuse an old SKM model instead of starting over?

Yes. ArcRoute imports an SKM PowerTools project so every existing device becomes a checklist item to verify on site, which is usually faster than collecting everything from scratch.

This guide is general information for qualified electrical professionals. Follow your company's safety program, NFPA 70E and the applicable standards for your site.

Request a demo

Tell us a bit about you and we'll be in touch to set up a time.

We'll only use this to contact you about ArcRoute.